Automotive Projects

Venables Associates have many years of experience designing and commissioning engineering systems within the automotive sector.  Our experience is diverse, ranging from cooling solutions for Formula 1 wind tunnels and dynamometers, to cooling and environmental control of engine test cells for automotive manufacturers.

Renault F1 Virtual Wind Tunnel

Building Services Consulting

Scope: Mechanical and electrical services design and commissioning.

– Ground breaking innovative technique for the UK construction industry

– 2m below ground

– Precast concrete tunnel sections

– Natural daylight provided through a series of rooflights

– Glazed facade at one of the building

– Computerised wind tunnel

– Seminar areas- Vehicle display areas
 
– Offices
 

– Integral data centre

– Displacement ventilation strategy in conjunction with thermal mass.

 

Ford Motor Company Centre of Engineering & Manufacturing Excellence

Building Services Consulting

Scope: Mechanical and electrical services design and commissioning.

– A new 25,000 sq m development

– Plus an independent two storey “Building Innovation Centre”

– Development was built on a raised site

– CEME provides further education facilities for 2000 students

– Includes workshops, teaching & conference areas and cafes

– Joint venture comprising directors from Ford Motor Co, Havering & Barking Colleges of Further & Higher Education, Heart of Thames Gateway Ltd and the Community

British American Racing Formula 1 Racing Team

Building Services Consulting

Scope: Mechanical and electrical services design and commissioning.

Fit-out Contract for Formula 1 Racing Team

– 7,590 sq m

– Workshops

– Executive Offices

– Race car preparation area

– Wind tunnel including rolling road test section

Red Bull Racing F1 Wind Tunnel

Building Services Consulting

Scope: Full MEP Design and Commissioning including full cooling and heating of Wind Tunnel, seminar areas, vehicle display areas offices and the integral data centre with the inclusion of Fuzzy logic controls

New F1 Wind Tunnel complex of original RAE building and concrete tunnel.

Jaguar Land Rover New NVH Centre,

Building Services Consulting

Scope: Full Design Duties RIBA Stage 1-3. Technical Design and Build RIBA Stage 4

– The new 432,600 sq ft noise, vibration and harshness centre would have represented the biggest NVH auto research centre in the UK, offering world class equipment, facilities and building performance to deliver class-leading vehicle refinement.